Justin Norcutt-06/23-27/2025

Journal Entry

Name: Justin Norcutt 

Week of: June 23–27, 2025 

Position: Field Operations / Line Striping & Surface Prep Technician 

Monday, June 23 

Location: Casa Grande, AZ 

Project: Trekell Rd – Line Obliteration 

Start Time: 4:00 PM 

Notes: Arrived on-site in the afternoon to begin obliteration of outdated traffic lines. Coordinated with crew to ensure proper safety measures were in place before starting operations. Worked through the evening to complete high-priority sections. 

Tuesday, June 24 

Location: Tucson, AZ 

Activity: Recovery/Rest Day 

Notes: Returned from Casa Grande early morning. Took scheduled rest day following late shift. Performed basic vehicle inspection and prep in the afternoon in anticipation of upcoming assignments. 

Wednesday, June 25 

Location 1: Maricopa, AZ 

Project: Red Curb Painting and Preformed Legend Installation 

Start Time: 6:00 AM 

Notes: Painted red curb zones and installed six preformed legends. Ensured all paint applications were clean, durable, and compliant with city specs. Managed equipment cleanup before departing. 

Location 2: Safford, AZ (Travel Only) 

Notes: Traveled to Safford in the afternoon to stage for multi-day Greenlee County project. Conducted evening equipment check and reviewed safety plan for next day’s road restriping. 

Thursday, June 26

Location 1: Tucson, AZ 

Project: Speedy Yard – Equipment Prep 

Start Time: 6:00 AM 

Notes: Remained in Tucson for equipment servicing and preparation of the water blaster unit. Completed oil checks, nozzle cleaning, and trailer hookup to ensure readiness for upcoming jobs. Maintained logs of all maintenance tasks performed. 

Friday, June 27 

Location 1: Nogales, AZ 

Project: RPM Installation and Speed Hump Road Tape Application 

Start Time: 6:00 AM 

Locations Covered: Country Club Dr, Al Harrison St, Frank Reed Rd 

Notes: Assisted with installation of Raised Pavement Markers (RPMs) and speed hump tape. Verified measurements, ensured spacing compliance, and monitored adhesive set time. Concluded the project with a full equipment teardown and load-out. 

Summary: 

This week involved a range of field tasks including late-day starts, long-distance travel, equipment prep, and on-site paint and tape applications across several cities. Maintained strong focus on safety, compliance, and project quality while coordinating across multiple job sites.